Before a contracting authority can publish a works tender on eTenders, someone has to assemble the pack: the right contract, the right instructions to tenderers, the right forms, and a folder for every document the design team will produce. It is usually the lead consultant, and they do it again for every project. These free builders do the setting up, so the time goes on the content.

Before a CWMF works tender goes out
  1. Choose the form of contractPW-CF1 to CF11
  2. Match the instructions to tenderersITT-W1 to W7
  3. Issue the suitability questionnaireQW1 or QW2
  4. Complete the Form of Tender scheduleVolume B
  5. Collect specs and drawings per disciplineVolume A
  6. Price document from the QSVolume C
  7. Information pack, incl. the PSHPVolume E

Who actually builds the tender pack

The tender belongs to the contracting authority: a council, an ETB, a school board, the HSE, the OPW. But on most capital works projects the pack is put together by the design team the authority appointed, led by one consultant who often goes on to act as Employer's Representative once the contract is signed.

Assembles the pack

Lead consultant

Usually the architect on building projects and the engineer on civils. Owns the ITT particulars and the Form of Tender schedule, and is often named Employer's Representative in the contract.

Volume C

Quantity surveyor

Bill of quantities, preliminaries and the pre-tender estimate, then the arithmetic check and tender report once tenders come back.

Volume A

Architect and engineers

Specifications and drawings, one set per discipline: architectural, civil and structural, mechanical, electrical.

Publishes and awards

Contracting authority

Approves the pack, publishes it on eTenders, answers clarifications, and runs evaluation, award and standstill.

Authorities with in-house design staff, such as local authority roads and water sections, the OPW and TII, often do all of this themselves.

Why it eats time on every project

The structure barely changes between tenders, but the details do. The contract follows from value, design responsibility and award criteria. The ITT follows from the contract and the procedure. The forms are revised regularly, and the version on cwmf.gov.ie ten days before the tender date is the one that applies. A practice running several tenders a year rebuilds the same folders from an old project and checks every form version again, every time.

How the builders work

  1. Answer a few questions

    What is being procured, who carries the design, the value, the procedure and the award criteria. Each answer is a click.

  2. Check the structure

    The builder picks the contract and shows every folder, with the documents each one needs. Override anything you disagree with.

  3. Download it

    Get a ZIP of the folders with a checklist in each and a document register. On the CWMF builder, a PowerShell script also downloads the official forms into place.

Pick your builder

Questions

Is it free?

Yes. Enter a work email once and the downloads unlock for both builders on that browser.

Are the forms current?

The CWMF builder links to the versions published on cwmf.gov.ie and shows the version and date of each. Confirm the current version before issue, as the CWMF suite is revised regularly.

Does it publish to eTenders?

No. It sets up the folders and checklists on your side. You publish on eTenders, Find a Tender or Public Contracts Scotland as you do now.

Does it replace procurement advice?

No. It follows the published rules for choosing a contract and lets you override any choice. The authority's own procurement advice still applies.